Municipal Yacht Harbor: The MYH was a 600 slip marina located on the south shore of Lake Pontchartrain in New Orleans, Louisiana. Instead of making repairs to the existing facility, the City has determined that the existing dock and mooring infrastructure be demolished and replaced with a floating dock system to provide the greatest resiliency and sustainability. The new harbor system being planned is a concrete floating dock system with wave attenuation designed to accommodate the needs of the regional boating community while meeting ADA access requirements. In addition to replacing the existing docks the project will also establish two new entry points for the marina, rehabilitate the eastern bulkhead and perform maintenance dredging.